Building


The building features exposed ductwork on the lower ground, ground and fifth floors and benefits from all new services and finishes throughout.


A fifth floor roof terrace provides St Paul’s Cathedral and City skyline views.


The contemporary reception features timber and back painted glass clad walls and stone flooring which offers a welcoming and high quality feel.

Low Carbon
Workplace


The Carbon Trust will work with and provide support to the tenant(s) during the fit out stage and subsequent occupation to ensure that energy costs are reduced and their carbon footprint minimised.

Building


The building features exposed duct work on the lower ground, ground and fifth floors and benefits from all new services and finishes throughout.


The contemporary reception features timber and back painted glass clad walls and stone flooring which will offer a welcoming and high quality feel.

Low Carbon
Workplace


Low Carbon Workplace will work with and provide support to the tenant(s) during the fit out stage and subsequent occupation to ensure that energy costs are reduced and their carbon footprint minimised.


All CGIs are for indicative puposes only

Accommodation

Floor sq ft sq m
Fifth SystemiQ Limited -
Fourth Autilla Limited -
Third The Private Office -
Second 5,370 498.8
First Royds Withy King -
Ground
Royds Withy King -
Lower Ground Royds Withy King -
Total 10,654 989.7

IPMS breakdown available upon request

Not to scale - for identification only

Specification / Amenities

Major refurbishment / part new construction

Feature timber + back painted glass cladding walls and stone flooring in reception

VRV air-conditioning (exposed ductwork to lower ground, ground and fifth floors)

Perforated metal plank suspended ceilings (first – fourth floors)

Raised access floors
(typical 150mm: fifth floor 100mm)

Typical finished floor to ceiling height: 2.6m (first - fourth floors)

Occupancy design: 1 person: 10 sq m
(means of escape 1:6 sq m)

2 x 13 person passenger pfts

Fifth floor roof terrace with City skyline views

26 secure bicycle spaces at lower ground level

3 showers and 16 “Z” lockers

Anticipated EPC rating of B

Anticipated BREEAM “Excellent” rating

A Low Carbon Workplace property

Project Team


Developer:
Low Carbon Workplace
Columbia Threadneedle
Stanhope

Architects:
Barr Gazetas

Main Contractor:
Ellmer Construction

Structural Engineers:
Evolve

Project Manager/QS:
Gleeds

Services Engineers:
Thornton Reynolds

Leasing Agents:
Gryphon Property Partners
Savills